Cognition about the construction process of prefabricated buildings

Cognition about the construction process of prefabricated buildings

Author: ComeFrom: Date:2018-06-04 16:43:02 Hits:227
From the height of the building, it can be divided into high-rise assembly buildings and low-rise assembly buildings; from the functional function, it can be divided into intelligent assembly buildings and functional assembly buildings; from the perspective of building materials, it can be divided into low-carbon assembly. Architecture and traditional prefabricated buildings.

The future of prefabricated buildings can not be called a prefabricated building, but should be called a prefabricated building system. The essential change should be a structural, functional, and materialistic composite upgrade. Looking at the response to this question alone, it is necessary to distinguish the height of the building.

Assembled steel structure interior

In general, its first core process should be reflected in the design. The birth of BIM will not only become a conjoined baby with the prefabricated building, but also extend more and greater value.

The rationality of the design directly determines the stability of the house and the way of connecting the points. It also determines the model of the board in production. If the standard board is set, the board of the opposite sex can be assembled according to the design needs of the house, and the site is cut, so that Collision wear during transportation can be avoided.

At the same time, prefabricated components can be numbered according to design management and transported sequentially to optimize installation efficiency. When performing on-site installation, the second core process is embodied in the main structure.
Page copyright:Aix Architectural Technology Co.,Ltd.  record number:Record number: Su ICP No. 18064053  Support:Kunshan qizhu